第1个回答 2009-06-02
Clothing order contract
Party: Ying Yuan Trade (China Yantai) HANALO COMMERCE CO., LED (Yantai Ying Yuan Import & Export Co., Ltd.)
B: Li Long YANTAI MUPING SHUNYIN CO., LTD
女裤production operations on the following contracts entered into to abide by.
The first product name: women's stretch cotton pants
Price: $ 3.1 yuan / piece (including fabric, accessories, packaging, freight lines combined with the processing price)
Quantity: 30,000 pieces
Color 26 27 28 29 30 32 the number of
Black 600 900 3,300 3,000 4,200 3,000 15,000 pieces of
White 300 450 1,650 1,500 2,100 1,500 7,500 pieces
Gray 300 450 1,650 1,500 2,100 1,500 7,500 pieces
T. TL 1,200 1,800 6,600 6,000 8,400 6,000 30,000 pieces of
Second place and time of delivery
1. Location: Yantai, Shandong
2. Time: fabric to plant 7 days after the delivery batches, 7 out of three days after the beginning of a cargo,
Each batch of shipments to reach around 3,000.
The form of a third processing
1. Party designated face, accessories factories, Party A Party B received after opening letters of credit from the purchase of face, accessories,
Face, both sides confirmed accessories for mass production.
2. Contracting Party B and provide all-included accessories in the way (Party of the material burden of 30%, the
Each shipment deducted at 30% of the purchase price of the fabric section).
3. The goods arrive at their designated locations Party, the A, B or both in accordance with orders to carry out an inventory list of acceptance,
And procedures for transfer of the signature.
Party responsible for the fourth
1. Party through clothing styles and fabrics, the entry into force and implementation of the contract are not allowed to change the process.
2. As in face, materials quality problems are brought about by Party A therefore be held fully responsible for the loss.
3. Click here to contract the date of payment, payment on time.
B be the responsibility of the Fifth
1. Party B by Party A to provide a single size of the standard production process.
2. Party B shall guarantee the quality of products, if the production problems, Party B shall be responsible for modifications.
3. Click here to contract delivery date, delivery on time.
Article VI settlement
1. Cash payments (each ship after passing inspection by the Party A number of prospective payment).
2. Customers by opening letters of credit, export of goods of all Party B to be withdrawn after the letter of credit. (Contracts can not be used during the period of export letters of credit, we can not apply to the bank)
Article VII of the signing of this contract is valid from the date of entry into force of all goods exports to date.
Article VIII of the contract signed and sealed by both parties after the entry into force. If there are differences in production, the two sides negotiated settlement,
If no consensus can be submitted to court.
Two copies of this contract, the two sides of a split.
第2个回答 2009-06-02
Clothing Ordering Contract
Party A: Trade Ying Yuan (China Yantai) HANALO TRADE CO., LED (Yantai Ying Yuan Import & Export Co., Ltd)
Party B: Chunlong Li MUPING SHUNYIN YANTAI CO., LTD
The two parties agree on the production of women trousers contracts as follows.
The first product name: women's cotton stretch pants
Price: $ 3.1 yuan / piece (including fabric, accessories, packaging, freight lines combined with treatment cost)
Quantity: 30,000 pieces
Color 26 27 28 29 30 32 the number of
Black 600 900 3,300 3,000 4,200 3,000 15,000 pieces
White 300 450 1,650 1,500 2,100 1,500 7,500 rooms
Gray 300 450 1650 1500 2100 1500 7500 parts
T. TL 1200 1800 6600 6000 8400 6000 30000 pieces
The second place and time of delivery
1. Location: Yantai, Shandong
2. Time: plant tissue 7 days after delivery of lots 7, three days after the beginning of a cargo
Transfer each batch to about 3000.
The shape of the third transformation
1. Designated face accessories factories, Part A Part B received after the opening of letters of credit for the purchase of the face, accessories,
Face, both sides confirmed accessories for mass production.
2. Party B and provide all the accessories included in the track (part of the material charge 30%, the
Each shipment to deducted 30% of the purchase price of the tissue section).
3. The goods arrive at the locations designated party, the A, B or both, pursuant to the order to conduct an inventory of acceptance
And procedures for the transfer of the signature.
Partly responsible for the fourth
1. Party through styles of clothing and textiles, the entry into force and implementation of the contract are not allowed to change the process.
2. As opposite, the problems of quality of materials are made by the Party to be held fully responsible for the loss.
3. Click here to contract the date of payment, payment on time.
B the responsibility of the Fifth
1. Part B to Part A to provide a single size of the production standard.
2. Part B is to ensure product quality, while the problems of production, Part B is liable to change.
3. Click here to contract delivery date, delivery on time.
Article VI of Regulation
1. Cash payments (from each vessel after the inspection of the part a number of potential payment).
2. Customers by opening letters of credit, export of goods from all parts B to be withdrawn after the letter of credit. (Contracts can not be used during the period of export letters of credit, we can not ask the bank)
Article VII of the signing of this contract is valid from the date of entry into force of the total exports of goods to date.
Article VIII of the contract signed and sealed by both parties after the entry into force. If there are differences in production, the two sides negotiated a settlement,
If a consensus fails, it can be submitted to the court.
This contract is composed of two copies, one copy for one party.
第3个回答 2009-06-02
A: (yantai China will yuan trade CO, COMMERCE HANALO) LED (yantai export Co., LTD will yuan),
B: LiChunLong YANTAI MUPING CO, LTD SHUNYIN
Just female trousers made under the contract signed business, abide by.
Article product name: cotton women's Hungarian
Price: $3.1 yuan / (including fabrics, materials, packing, shipping and contain the processing line)
Quantity: 30,000 pieces
26 and 27 and 28 and 30 color number 32
Black 600 900 33 3,000 4,200 3,000 15,000
White 300 450 1,650 1,500 21 1,500 7,500
Gray 300 450 1,650 1,500 21 1,500 7,500
T.T L 1,200 1,800 6,600 6,000 84 6,000 30,000 pieces
Article 2 the delivery place and time
1: shandong yantai harbour
Time: 2 after the fabric to 7 partial shipments, 7 days started 3 days a substandard goods,
Each shipment will reach about 3,000 pieces.
Article 3 processing forms
1 party a hereby appoints party b, accessories factory, open the l/c come from party a, after buying complementary makings,
Surface, both sides affirm after batch production.
2 party b contractor to provide all the materials and auxiliary (party a burden, 30% of the fabric,
Every time when the shipment in payment of fabrics of 30%).
3 party a after the arrival of the goods at the designated place, according to the order of party a and party b shall check list,
Signature and handing procedures.
Article 4 a responsibility
1 party a and fabric by dress design, after contract become effective and implementation process shall not modify.
2 in the face, accessories such as quality problems are all assume this party.
3 the contract according to the date of payment, the payment on time.
5 party b
1 party b according to the standard production craft single dimension.
2 party b shall guarantee the quality of its products, such as a problem, party b shall be responsible for change.
3 according to this contract, on time delivery date of delivery.
Article 6 settlement
1 each shipment (cash when party a according to the number of qualified inspection must pay).
2 the client open l/c and after shipment shall revoke all export credit. The contract period can use (export credit, nor applies to the bank),
Article 7 the contract period from the date, all goods exported to date.
Article 8 the contract signed by both parties. If in the production process, both parties should negotiate disagreement,
If through consultation by the court can solve.
This contract shall have two copies, one for each party希望帮到你本回答被网友采纳
第4个回答 2009-06-02
A: (yantai China will yuan trade CO, COMMERCE HANALO) LED (yantai export Co., LTD will yuan),
B: LiChunLong YANTAI MUPING CO, LTD SHUNYIN
Just female trousers made under the contract signed business, abide by.
Article product name: cotton women's Hungarian
Price: $3.1 yuan / (including fabrics, materials, packing, shipping and contain the processing line)
Quantity: 30,000 pieces
26 and 27 and 28 and 30 color number 32
Black 600 900 33 3,000 4,200 3,000 15,000
White 300 450 1,650 1,500 21 1,500 7,500
Gray 300 450 1,650 1,500 21 1,500 7,500
T.T L 1,200 1,800 6,600 6,000 84 6,000 30,000 pieces
Article 2 the delivery place and time
1: shandong yantai harbour
Time: 2 after the fabric to 7 partial shipments, 7 days started 3 days a substandard goods,
Each shipment will reach about 3,000 pieces.
Article 3 processing forms
1 party a hereby appoints party b, accessories factory, open the l/c come from party a, after buying complementary makings,
Surface, both sides affirm after batch production.
2 party b contractor to provide all the materials and auxiliary (party a burden, 30% of the fabric,
Every time when the shipment in payment of fabrics of 30%).
3 party a after the arrival of the goods at the designated place, according to the order of party a and party b shall check list,
Signature and handing procedures.
Article 4 a responsibility
1 party a and fabric by dress design, after contract become effective and implementation process shall not modify.
2 in the face, accessories such as quality problems are all assume this party.
3 the contract according to the date of payment, the payment on time.
5 party b
1 party b according to the standard production craft single dimension.
2 party b shall guarantee the quality of its products, such as a problem, party b shall be responsible for change.
3 according to this contract, on time delivery date of delivery.
Article 6 settlement
1 each shipment (cash when party a according to the number of qualified inspection must pay).
2 the client open l/c and after shipment shall revoke all export credit. The contract period can use (export credit, nor applies to the bank),
Article 7 the contract period from the date, all goods exported to date.
Article 8 the contract signed by both parties. If in the production process, both parties should negotiate disagreement,
If through consultation by the court can solve.
This contract shall have two copies, one for each party.