My plan is to develop a procedure for us to follow. Such as ECO (Engineering Change Order), MDA (Manufacture Deviation Authorization), Part number system, Drawing Control Documentation, Manufacture BOM and Warrantee BOM, Project Flow (VSM-Value Stream Mapping), Engineering Pilot, Manufacturing Pilot, etc. I also plan to have training class for my engineers for design and certification to improve their skills. It will take some time to implement all these procedure. Currently I have already introduced VSM, Engineering Pilot, and Manufacturing Pilot to some of my engineer staffs. To implement all the other procedure I will need the cooperation from the other departments. After Chinese New Year I will start call for a meeting with other departments to improve the situation.